Unexpectedly, as it so often does, the S7 CPU Went down, and nobody had a copy of the program that was installed into it. The OEM found us and asked us if we could go and install and program a new PLC into the cabinet and get the saw running. 4hrs later, we were onsite and accessing the situation. The operator still had the original schematics from the machine, so we were able to utilize those to get a proper IO count for the machine. Once we had the IO count, we determined the Productivity 1000 PLC and Zip Link connectors would fit the application nicely.